PFNY6-005Q9-F10 YOCTO NET D6 WEB LOG 8 FULL 85÷265V 2DI 2DO WEB DATA MANAGER

Electrex - Monitoring
ENERGY MONITORING

Electrex - Energy Automation
ENERGY AUTOMATION

Electrex - Notification
ALARMS AND NOTIFICATIONS

Electrex - Calendar
CALENDARS

Electrex - Power Quality
POWER QUALITY ANALYSIS

YOCTO NET D6 WEB LOG 8 FULL 85÷265V 2DI 2DO WEB DATA MANAGER

Cod. PFNY6-005Q9-F10

Network bridge between the Ethernet network (Modbus TCP/IP protocol) and the RS485 line (Modbus RTU protocol) for communication and data-logging of Electrex devices. FSTN graphic display. Modbus-TCP Server (max. 4 simultaneous connections). Astronomical and perpetual clock/calendar, battery powered and non-volatile, industrial type memory. Remote firmware update. Built-in WEB Server including Upgrade Web option: standard web pages for real-time measures displaying. Already activated one Log 8 logging service (log of 8 Electrex instruments/Modbus registers, power / energy and digital inputs), Upgrade Charts for historical data displaying on graphs, Upgrade Energy Automation, E-Mail/Sms and Calendars. FTP Server. 2 digital inputs and 2 digital outputs. ExpBus, high speed communication, port for external devices (inputs and outputs modules, and environmental sensors). Equipped with NFC technology. DIN rail mount 6 modules. Wide range power supply 85÷265V/100÷374VDC.



Versions equipped with the built-in SI (Sensor Inputs) module can integrate the following external environmental sensors:


On this version of Yocto net it is possible to implement the following functions ordering a PUK code to be inserted via the internal configuration web page for the activation:

Net upgrade Log 16 (PUK) Cod. PFSU940-02
Doubles the capacity of the storage services from Log 8 to Log 16. All the 8 Net upgrade Log 8 (PUK) code PFSU940-01 must have been installed previously.

Net upgrade Open Log (PUK) Cod. PFSU940-25
Allows to modify the sampling frequency and the choice of parameters to be logged for an existing Log 8 service for e.g. when performing a measurement campaigns. The Log 8 services to be modified must already be active and if, for example, it is needed to modify two Log 8 services, it is necessary to activate two PUK Open Log.

Net upgrade WEB Open (PUK) Cod. PFSU940-10
Adds to the Yocto net D6 Web the ability to upload and display custom Web pages.